top of page
India-road-traffic-and-transportation-ATC-survey-Companies  in Dhaka Bangladesh.

Road Traffic Survey Company in Dhaka & Transportation  Analysis ATC Surveys Bangladesh| Public Zone Study | Inventory 

Bagladesh's Leading Company is the best in Traffic and Transportation Surveys Companies in Dhaka Bangladesh. Traffic Analysis survey in Dhaka Bangladesh. Public Transport Study in Mumbai, Inventory of Road Network Survey , Traffic Volume Count, Intersection Survey. House hold Survey, Road intersection Survey, Speed and delay study in Dhaka Bangladesh. 

We are the services Provider of Traffic Survey - Classified Traffic Volume Counts Survey, Intersection Turning Movement Survey. Axle Load Survey and Origin-Destination Survey offered by Traffic Surveyors & Consultants.  India Traffic Survey, Classified Traffic Volume Counts Survey. Intersection Turning Movement Survey, Axle Load Survey, Origin-Destination Survey, Public Transport Survey.

.

  • Traffic and Transportation Surveys in Dhaka Bangladesh.

  • Traffic Analysis Zone in Dhaka Bangladesh.

  • Public Transport Study in Dhaka Bangladesh.

  • Inventory of Road Network Survey in Dhaka Bangladesh.

  • Traffic Volume Count Survey in Dhaka Bangladesh.

  • Road Intersection Survey in Dhaka Bangladesh.

  • House hold Survey in Dhaka Bangladesh.

  • Road Intersection Survey in Dhaka Bangladesh.

  • Speed and Delay study survey in Dhaka Bangladesh.

  • Pedestrian Survey in Dhaka Bangladesh.

We offer our services from different parts of India like 

Dhaka Bangladesh | Method of Traffic and Road Transport 

Inventory of Road Network System companies in Dhaka Bangladesh

Objectives  To appreciate the physical characteristics of the identified road network in terms of right of‐ way, carriage way, number of access points, surface type, etc.  To identify physical constraints and bottleneck points along the identified road network.  To assess the capacity potential of the identified road network  To understand the existing transport situation in order to develop a rational land use and transport plan and mobility improvement measure. Inventory - a complete list of items  Review of existing transport infrastructure and facilities, including:

  • Flyovers/ underpasses,

  • Major intersections,

  • Parking/ Pedestrian

  • NMV facilities, 

  • Level Railway Crossings Road Inventory

Classified Turning Volume Count companies

We provide this survey to carried out to analyze variety of vehicle passing through the particular road over a day 24 hr for seven days or 30 days. This survey provide the Average daily traffic(ADT) . India Road Traffic & Transportation ATC Surveys | Traffic Analysis Zone | Public Transport Study| Inventory of Road Network

  • This provide the Characteristics of the study area.

  • Traffic Volume on particular road.

  • Spatial  distribution of the traffic.

  • Average Daily Traffic (ADT).

  • Circulation of the traffic on the road.

Road Side Origin and Destination 

We are leader in providing this type of survey. the main objective of this survey is to appreciate the traffic characteristics, pattern of passenger and goods traffics and estimate the intensity of through and destination traffic. We use two survey method in this survey: Road side interview method and Registration number plate survey.

  • This provide the Travel pattern.

  • OD Matrix to calibrate a transport Demand Model.

  • Characteristics, desired pattern of passenger and goods traffics.

  • Estimate the intensity of through and destination traffic.

Household Survey| Mobility 

We provide this survey to get the socio-economic Characteristics, desired pattern of traffics, travel Characteristics(i.e. Total trip, purpose of trip, transport use, trip up and down start and end point ) of the household. We used Household  Interview method for this survey. 

  • To get the socio-economic Characteristics of the area.

  • Characteristics, desired pattern of passenger and goods traffics.

  • Travel Characteristics. like no of travel and used transport Up and down datils.

Pedestrian Analysis

We provide this survey to get the information of the volume count along and across the pedestrian. The main objective of this survey to provide the facility like light, comfort, and safety to the passengers. We used manual count and videography  method for this survey. India Road Traffic & Transportation ATC Surveys |Traffic Analysis Zone | Public Transport Study | Inventory of Road Network.

  • To get the socio-economic Characteristics of the area.

  • To know no of pedestrian and additional pedestrian required for Road.

  • Travel Characteristics(i.e. Total trip, purpose of trip, transport use, trip up and down start and end point ).

Intersection Survey| Intersection turning Movement | Queue Length 

We provide this survey to measure turning movement at key intersection during the peak hour(Morning and evening). it also provide the severity of traffic congestion quantitatively.  We used manual count and videography  method for this survey. 

  • To know the performance Characteristics intersection.

  • To know severity of traffic congestion.

  • To Measure turning movement at key intersection during the peak hour.

Speed and Delay Studies

We offer the Speed and Delay Studies survey. The main objective of this survey n to get the journey and running speed along the road network and to identify the the bottleneck point. it also quantify delay and identify factor causing delay.  We used Moving Observer Methods and Registration Number method for this survey. 

  • Journey and running speed along the road network.

  • It quantify delay.

  • Identify factor causing delay.

OUR SERVICES

Domain Technology

  • GIS & Remote Sensing

  • 3D Laser Scanning

  • UAV Aerial Drone Survey

  • GPS & DGPS Technology

  • LIDAR Technology

  • Total Station

  • Digital Level 

  • GIS Analysis Tools

Sector

  • Construction & Infra 

  • Architecture & Design

  • Agriculture Sector

  • Telecom Network

  • Transmission Line  

  • Mineral and Resource

  • Mine and Energy sector

  • Road  Construction

bottom of page